SEWER SYSTEMS

New Brighton

Download


New Brighton Case Study (PDF)

The Land

New BrightonNew Brighton and the adjacent town of Billinudgel are low-lying beachside communities in New South Wales. As many homes are holiday homes, the population varies between 350 and 750 residents.

The Problem

  • Low-lying area with high water table and prone to flooding
  • Acidic, sandy soil

The Solution

  • 13 km of PN 16 pressure pipe installed via horizontal directional drilling
  • 204 E/One GGI stations

Client Outcome

"… Our costs associated with the upkeep of the system are significantly lower than what we had estimated. "

Peter Rees
Manager Operations Water
Byron Shire Council